Profile  Space program  Grants  Cooperation  Results  Popular science       Misc. Home Slovak
2/2
The launch campaign of the ACTIVE mission in September 1989. The piggyback microsatellite MAGION-2 connected to main ACTIVE spacecraft. The SPE-1 is installed on board of the main spacecraft.
The launch campaign of the ACTIVE mission in September 1989. The piggyback microsatellite MAGION-2 connected to main ACTIVE spacecraft. The SPE-1 is installed on board of the main spacecraft.
2/2


  (c) I&S'2007-2016